Spacez insight · March 2026 · 8 min read
Commercial Fitout Checklist Melbourne | Planning Guide
Planning a commercial fitout in Melbourne? Use this checklist to make sure nothing is missed — from brief to handover. Free consultation from Spacez.
Commercial Fitout Checklist Melbourne: Everything You Need to Plan
A commercial fitout has a lot of moving parts. Missing something at the planning stage is expensive — you'll pay to fix it during construction or, worse, live with it for the length of your lease.
This checklist is designed for Melbourne businesses planning an office, retail, or hospitality fitout. Work through it before you sign a lease, before you engage a fitout company, and again before construction starts.
Before You Sign Your Lease
The most important fitout decisions happen before you sign your commercial lease. Once you've signed, your options narrow significantly.
- [ ] Inspect the tenancy in person — don't rely on floor plans alone. Visit during business hours to assess natural light, noise levels from neighbouring tenants, and the feel of the building.
- [ ] Check the fit category — is it bare shell (Category B), warm shell (Category C), or a previously fitted tenancy? This determines your fitout scope and cost.
- [ ] Assess existing services — ask building management for the age and condition of the HVAC system, electrical switchboard, and data infrastructure. Old services add cost.
- [ ] Ask about landlord fitout approval process — how long does it take? Who approves it? What documentation is required? This affects your timeline.
- [ ] Request the fitout guide — most commercial buildings have a fitout guide specifying materials, base building contractor requirements, and design restrictions.
- [ ] Check heritage status — is the building heritage-listed? Inner Melbourne buildings with heritage overlays can restrict external changes and sometimes internal alterations.
- [ ] Negotiate a fitout contribution — lease incentives (cash or rent-free) can significantly offset your fitout cost. Negotiate this before signing.
- [ ] Negotiate a make-good clause — understand exactly what you'll need to do at lease end. A make-good cap or waiver for approved works protects you later.
- [ ] Confirm the lease commencement date — this is your hard deadline. Work backwards from it for your fitout programme.
- [ ] Get a fitout cost estimate before signing — engage a fitout company for a rough estimate before you commit to the tenancy. Know the full cost before the ink is dry.
Brief and Scope
- [ ] Headcount and growth forecast — how many people now, and how many in 12–18 months? Design for growth within your lease term.
- [ ] Work modes — how does your team actually work? Open plan, private focus, collaboration, client meetings, video calls? The brief should reflect reality, not aspiration.
- [ ] Meeting room requirements — how many rooms, what sizes, what technology (screens, video conferencing, whiteboards)?
- [ ] Kitchen brief — how many people use it simultaneously at peak? Seating? Coffee machine? Refrigeration? Dishwasher?
- [ ] Storage requirements — physical file storage, stationery, equipment, lockers for staff?
- [ ] Accessibility requirements — DDA compliance is mandatory. Are there specific needs beyond the minimum?
- [ ] End-of-trip facilities — bike storage, showers, lockers? Increasingly important in Melbourne's cycling-commuter culture.
- [ ] Technology infrastructure — server room or IDF requirements, data point density, AV in meeting rooms.
- [ ] Brand requirements — what does your brand identity require in the physical environment? Colours, materials, signage?
- [ ] Acoustic requirements — open plan offices without acoustic treatment are unusable. Address this explicitly in the brief.
Budget
- [ ] Construction fitout cost — the main line item. See our commercial fitout cost guide for Melbourne ranges.
- [ ] Design fee — included in D&C contracts; separate if using a design-only architect.
- [ ] Furniture — workstations, chairs, meeting room furniture, collaboration furniture. Often $15,000–$80,000+ depending on headcount and specification.
- [ ] Technology and AV — IT infrastructure, screens, video conferencing, access control, CCTV. Often $10,000–$50,000+.
- [ ] Signage — reception, wayfinding, external building signage if applicable.
- [ ] Building permit fees — typically $3,000–$8,000 depending on project value.
- [ ] Landlord approval documentation — usually included in fitout company fee; confirm this.
- [ ] Relocation/moving costs — often overlooked. Budget for professional movers, IT disconnection/reconnection, and any temporary storage.
- [ ] Contingency — minimum 10% of construction cost. More for older buildings or complex fitouts.
- [ ] Lease incentive offset — subtract any landlord contribution from your gross budget to get your net spend.
Engaging a Fitout Company
- [ ] Get at least three quotes — from companies with relevant experience in your fitout type and size.
- [ ] Provide a written brief — the same brief to every company, so quotes are comparable.
- [ ] Confirm it's a fixed-price contract — understand what triggers variations and what is covered by the fixed price.
- [ ] Check the exclusions list — what is specifically not included in the quote?
- [ ] Confirm permit management is included — building permit management should be part of the service.
- [ ] Confirm landlord approval documentation is included — this is a significant documentation task.
- [ ] Ask who your project manager will be — meet them before signing.
- [ ] Check insurance — public liability (minimum $20M), professional indemnity (if design is included), contract works.
- [ ] Check references — call at least two references from similar projects.
- [ ] Confirm the programme — get a high-level programme showing key milestones and practical completion date before signing.
For guidance on what to look for in a fitout company, see our how to choose a commercial fitout company Melbourne guide.
Design and Documentation
- [ ] Spatial plan approved — floor plan signed off before detailed design proceeds. Changes at this stage are cheap; changes during construction are expensive.
- [ ] Concept design approved — materials palette, finishes direction, joinery approach.
- [ ] Meeting room technology specified — screens, video conferencing, acoustic treatment all need to be designed in.
- [ ] Lighting design reviewed — not just "there are lights." Consider zones, task vs ambient, feature lighting, and natural light integration.
- [ ] Joinery drawings reviewed — custom joinery is the highest-variability item in fitout budgets. Approve shop drawings before fabrication.
- [ ] Accessibility compliance confirmed — DDA compliance should be reviewed by the designer and confirmed in documentation.
- [ ] Services coordination confirmed — mechanical, electrical, data, and hydraulic services all need to be coordinated in 3D or at minimum in plan.
Approvals
- [ ] Landlord/building owner submission made — allow 3–6 weeks for institutional landlords in Melbourne CBD and Southbank.
- [ ] Building permit lodged — allow 3–4 weeks for a private certifier in Melbourne.
- [ ] Fire engineering approved (if required) — high-rise Melbourne CBD buildings sometimes require fire engineering sign-off.
- [ ] Sprinkler modification scope confirmed — if your floor plan changes room layouts, sprinkler modifications may be required. Confirm the base building contractor and their lead time.
- [ ] Any planning permit lodged (if required) — change of use or heritage works may require council planning approval.
Construction
- [ ] Site induction completed — you or your representative should attend a site induction before construction starts.
- [ ] Base building protection confirmed — lifts, lobbies, and common areas should be protected before trades move through them.
- [ ] Progress inspection schedule agreed — when can you access the site for inspections? Typically at frame, services rough-in, and pre-plasterboard stages.
- [ ] IT and AV contractor engaged — your IT company needs to be involved during construction (cable runs, IDF fitout, rack installation). Don't leave this to the last week.
- [ ] Furniture delivery date confirmed — furniture lead times can be 6–10 weeks. Order early; confirm delivery date coordinates with practical completion.
- [ ] Change order management — any scope changes during construction should be in writing with agreed cost and time impact before work proceeds.
Pre-Handover
- [ ] Pre-handover walkthrough — inspect the space with your project manager before practical completion. Document everything that needs rectification.
- [ ] Defects list issued and agreed — items to be rectified before or immediately after handover.
- [ ] Mechanical commissioning certificates obtained — HVAC must be commissioned and a commissioning certificate issued.
- [ ] Electrical test certificates obtained — certificate of electrical safety required.
- [ ] Building permit final inspection completed — the building surveyor must sign off on the final inspection.
- [ ] As-built documentation received — drawings showing what was actually built (which sometimes differs from design drawings due to on-site changes).
- [ ] Warranties and manuals received — warranties for joinery, mechanical plant, electrical components, and materials.
Move-In
- [ ] IT infrastructure commissioned — workstations, phones, internet, video conferencing tested before staff arrive.
- [ ] Staff briefed on the new space — desk assignments, meeting room booking, kitchen etiquette, end-of-trip facilities.
- [ ] Key and access card distribution — who has what access? Building access, floor access, server room access.
- [ ] Building management induction — introduce your team to building management contacts, emergency procedures, loading dock procedures.
- [ ] Defects liability period begun — note the start date of your 12-month defects period and the fitout company's contact for defect reports.
Frequently Asked Questions
When should I start working through this checklist?
Start from the top — the pre-lease section — before you sign your commercial lease. Many Melbourne businesses sign their lease and then start thinking about fitout, which compresses an already-tight timeline.
Do I need to work through the entire checklist for a small office?
The checklist scales — a 50sqm office refurbishment doesn't need all items. Focus on the sections relevant to your scope. The budget section and the "engaging a fitout company" section are relevant for any size project.
What's the most commonly missed item?
IT and AV contractor coordination during construction. Many businesses leave IT to the last week of the project, then discover cable runs need to be added to finished ceilings, data points are in the wrong locations, or the server room fitout hasn't been done. Engage your IT company at the start of design, not at the end of construction.
Is there anything I can skip if I'm working with a good fitout company?
A good fitout company manages many of these items on your behalf — permit lodgement, landlord approval, mechanical commissioning. But the business decisions (headcount, brief, furniture, IT) remain yours. The checklist distinguishes between what you need to manage and what your fitout company manages.
Ready to Start Your Melbourne Commercial Fitout?
When you're ready to engage a fitout company, contact Spacez for a free consultation. We'll work through your brief with you and give you honest advice on scope, cost, and timeline.
Also useful: Commercial fitout cost Melbourne | Office fitout timeline Melbourne | Tenant fitout Melbourne