Spacez insight · April 2026 · 8 min read
How to Brief a Fitout Builder Melbourne | Get Better Results
A commercial fitout brief is the document that defines what you want built. Without it, the builder is guessing — and guessing costs money.
Why the Brief Matters
A commercial fitout brief is the document that defines what you want built. Without it, the builder is guessing — and guessing costs money.
What happens without a proper brief:
- Builders quote against different assumptions and you cannot compare quotes meaningfully
- The design process starts with misaligned expectations and needs multiple revisions
- Scope keeps expanding during construction (variations are almost always more expensive than including the item in the original scope)
- You end up with a fitout that technically satisfies the brief but does not work the way you intended
What happens with a well-structured brief:
- Builders quote against the same scope — quotes are genuinely comparable
- The designer understands the priorities and makes informed decisions within budget
- Variations are minimised because the scope was properly defined upfront
- The fitout serves its actual purpose because that purpose was articulated clearly
Part 1: The Basics
1.1 The Tenancy
The builder needs the following information about the space:
- Address — including floor and suite number
- Tenancy size — gross floor area in sqm; if you don't know, ask the landlord or the agent
- Current condition — base building spec (new spec suite ready to fitout, previously tenanted and needs strip-out, raw shell/cold shell, existing fit and plant in situ)
- Building type — CBD A-grade, B-grade, suburban strata, converted warehouse, heritage building; this affects how the fitout builder approaches services integration
- Building name — the builder will typically know the building and its base building standard
- Access — loading dock access, lift availability, hours of access for construction
1.2 The Lease
- Lease term — how long is the lease? This affects the fitout specification standard (a 5-year lease justifies a different spec level than a 10-year lease)
- Lease commencement — when does your rent-free fitout period begin and end? The construction programme must fit within this window
- Landlord fitout contribution — has the landlord offered a tenant improvement allowance (TIA)? How much? This affects budget expectations
- Make-good obligations — what is the make-good requirement at end of lease? Strip back to shell, or return in current condition? This affects whether demountable partitions are worth specifying
- Building management approval requirements — are there specific building management requirements for fitout works (after-hours noise restrictions, approved subcontractors list, base building tie-in sign-off requirements)?
1.3 Programme
- Target occupation date — when do you need to move in?
- Working back from your occupation date: allow for design (3–6 weeks), approvals (4–8 weeks), joinery fabrication (4–6 weeks, parallel with approvals), and construction (4–12 weeks depending on size). Total: 14–28 weeks for most projects.
- Hard deadline or flexible? — A hard deadline (e.g., your existing lease expires) changes how the builder approaches the programme and procurement
Part 2: The People
2.1 Who Will Use the Space?
The builder needs to understand who the fitout is for:
- How many people? — headcount (current and projected over the lease term)
- What roles? — are they mostly desk-based workers? Client-facing roles? Mobile workers who are rarely at their desks? Production or technical roles?
- What are their working patterns? — in the office full time, hybrid, shift-based?
- Does the space need to grow? — will you hire significantly during the lease? If so, design for the future headcount, not just the day-one headcount
2.2 Who Are Your Clients?
- Do clients visit your premises? — if yes, what is the client journey? Where do they arrive, wait, meet?
- What impression do you want to create? — how should a client feel when they walk in?
- How many clients visit simultaneously? — this drives waiting area sizing
2.3 Organisational Structure
- Do teams need to sit together? — proximity requirements between teams or roles affect the layout
- Are there confidentiality requirements? — some roles require acoustic separation or visual privacy
- Do you have a facilities or IT team on site? — they may have specific infrastructure requirements (server room, tool storage)
Part 3: The Space Requirements
This is the core of the brief. For each type of space you need, define:
3.1 Workstations
- Number of workstations (note: not the same as headcount if you are hot-desking)
- Workstation type: sit-stand or fixed height? Individual or shared benches? With or without screens/partitions?
- Monitor setup: dual monitors at each workstation? Monitor arms or fixed?
- Storage at workstation level: pedastals or lockers? (Lockers are required if hot-desking)
3.2 Meeting Rooms
For each meeting room:
- Capacity (4-person, 6-person, 10-person boardroom, etc.)
- AV requirements: screen size, video conferencing (web cam or room-grade camera?), whiteboard (physical or digital?), presentation from laptop
- Acoustic requirement: standard (STC 45–50) or premium (STC 55+)?
- How will it be booked? — room booking panel at door? If so, specify the system
3.3 Phone Booths and Focus Rooms
- How many? (Rule of thumb: 1 booth per 8–10 workstations)
- Size: 1-person standing, 1-person with seat, 2-person, 4-person
- Proprietary pod or custom-built?
3.4 Reception and Waiting
- Reception: staffed or unstaffed? If staffed, how many receptionists simultaneously?
- Waiting: how many people typically wait simultaneously?
- Security: secure access from reception to the workspace? If so, what type of access control?
3.5 Kitchen and Social
- Kitchen usage: coffee machine type (fully automated commercial machine, pod machine, bench-top); cooking on-site (microwave, oven, hotplates)?
- Seating in kitchen: how many people eat at their desk vs. in the kitchen?
- Dishwasher? — for offices with 20+ staff, a dishwasher is strongly recommended
- Social / collaboration area adjacent to kitchen — how many people, what purpose (casual meetings, lunch, all-hands gatherings)?
3.6 Specialist Spaces
Any of the following that apply to your business:
- Server room / IT equipment room
- Training room (separate from meeting rooms)
- Storage (general, archive, equipment)
- Bike storage and end-of-trip facilities
- Print/copy room
- Welfare facilities (first aid room, parent's room)
- Any industry-specific spaces (treatment rooms, lab, workshop, showroom, etc.)
Part 4: The Design Brief
4.1 Brand and Aesthetic
- Reference images — collect 10–20 images from other fitouts, interior design references, or your competitors that represent the aesthetic you are aiming for. Pinterest, LinkedIn, Dezeen, and ArchDaily are good sources. You do not need to love every element of each reference — you can note what you like and don't like about each one.
- Brand colours and materials — do you have brand guidelines? If so, provide them. Are there specific colours or materials that must be incorporated?
- Tone: corporate and formal, relaxed and creative, premium and minimal, warm and welcoming — use words to describe the feeling you want to create
4.2 Priorities
Be explicit about where the budget should be concentrated:
"Our client meeting room and reception are the highest priority — these are where clients form their impression of us. The back-office workstations can be more functional. The kitchen is important but does not need to be extravagant."
This allows the designer to make informed decisions when budget trade-offs are required.
4.3 Things You Want to Avoid
It is as useful to say what you don't want as what you do:
- "No open ceilings — we want a finished, corporate look"
- "No carpet — we want hard flooring throughout"
- "No glass partitions — we need acoustic privacy"
- "We don't want a feature wall — keep it restrained"
Part 5: Budget
The most important and most frequently omitted element of the brief.
Why you must share your budget:
- A designer designing to an unknown budget will either over-design (and the quote comes in too high) or under-design (and the result does not match your expectations)
- A builder who knows the budget can tell you immediately whether the brief is achievable, and where trade-offs need to be made
- Budget transparency leads to better outcomes — the builder will tell you how to allocate the budget for maximum impact
If you don't know your budget:
Use the following rough guide to set a starting point:
| Specification Level | Cost per sqm |
|---|---|
| Functional (basic finishes, standard furniture) | $800–$1,400/sqm |
| Mid-market (quality finishes, considered design) | $1,400–$2,200/sqm |
| Premium (bespoke joinery, premium materials) | $2,200–$3,500/sqm |
| Luxury (fully custom, premium everything) | $3,500+/sqm |
Multiply by your floor area to get a starting budget range. Then share that range with your builders.
What to do if your budget is below what the brief requires:
Ask the builder to tell you what can be delivered within your budget and what can be deferred to a later stage. A staged fitout approach — where the core is built now and additional elements (like a breakout room or improved kitchen) are added in Year 2–3 — is a legitimate strategy.
Presenting the Brief
Once you have assembled the brief, structure it as follows:
- Cover page: project name, tenancy address, date
- Project overview: tenancy details, lease term, key dates, budget
- Space requirements: room-by-room with quantities and specifications
- Design brief: aesthetic references, brand guidelines, priorities, things to avoid
- Programme: target completion date, key milestones
- Appendices: tenancy plan, brand guidelines, reference images, any landlord requirements documents
A well-structured brief allows builders to provide accurate, comparable quotes. It also demonstrates that you are a well-prepared client — which attracts better proposals and more committed attention from quality builders.
Frequently Asked Questions
Do I need to have a budget figure before approaching a builder?
Not a precise figure, but a range is important. "We want to understand what things cost before setting a budget" is a reasonable position, and most builders will provide indicative budget guidance based on your brief. But you should be prepared to share your budget range when you request detailed quotes — it enables the builder to design and price accurately.
Should I approach multiple builders for quotes?
Yes — three is the standard. More than three generates diminishing returns and consumes disproportionate time from the builders (each of whom is investing in the quote). Provide the same brief to each builder so quotes are comparable; if you change the brief between builders, the quotes will not be comparable.
How detailed does the brief need to be?
Enough to answer the key questions — who uses the space, how many of each space type is needed, what is the budget, what is the aesthetic direction, and when does it need to be complete. You do not need an architectural drawing at brief stage. The builder will develop the design based on your brief.
Spacez provides free pre-brief consultations to help you structure your fitout requirements before going to quote. Contact us to arrange a site visit and brief workshop.