Spacez insight · April 2026 · 6 min read
Office Fitout Checklist Melbourne | Step-by-Step Planning Guide
Commercial fitouts are complex projects involving multiple trades, compliance requirements, landlord approvals, and logistical coordination. A fitout that…
Why Planning Matters in a Commercial Fitout
Commercial fitouts are complex projects involving multiple trades, compliance requirements, landlord approvals, and logistical coordination. A fitout that seems straightforward — say, a 200 sqm office in South Melbourne — can involve:
- Architectural drawings and council submissions
- Builder's licence requirements and OH&S compliance
- Landlord and body corporate approvals
- Coordination between electricians, plumbers, data cabling contractors, and builders
- Lead times for joinery, furniture, and specialist equipment
Without a checklist and clear project brief, these moving parts can cause delays, budget blowouts, or rework that could have been avoided.
The Complete Office Fitout Checklist
1. Define Your Brief
Before engaging any fitout company, document your requirements clearly:
- Headcount: How many people will work in the space now, and in 2–3 years?
- Workstyle: Do you need open-plan collaboration zones, private offices, or a hybrid layout?
- Departments: What teams need to sit together or separately?
- Special requirements: Server room, reception, boardroom, breakout areas, wellness rooms?
- Brand expression: What does the fitout need to communicate about your business?
- Budget range: What is your confirmed budget, including a contingency reserve (typically 10–15%)?
A clear brief saves significant time during quoting and design and prevents scope creep later.
2. Confirm Your Lease Terms
Your lease directly affects what you can and cannot do to the space:
- ✅ Review your lease for fitout obligations and restrictions
- ✅ Identify whether a Landlord's Works Package or Tenant Improvement (TI) allowance applies
- ✅ Confirm if landlord approval is required before works commence
- ✅ Check make good obligations — what must be restored at lease end?
- ✅ Confirm the permitted use clause aligns with your intended operations
- ✅ Identify any base building services (HVAC, fire, data) you need to tap into
If you're unsure about your lease obligations, seek legal advice early. Spacez can advise on make good requirements and help you understand what your lease allows.
3. Understand Permit and Compliance Requirements
Most commercial fitouts in Melbourne require permits and must comply with the National Construction Code (NCC) and relevant Australian Standards:
- ✅ Building permit — required for structural works, fire systems, and most commercial fitouts
- ✅ Plumbing permit — for new or modified plumbing
- ✅ Electrical approval — for new switchboards, sub-metering, or major power upgrades
- ✅ Access compliance — DDA (Disability Discrimination Act) requirements for accessible design
- ✅ Fire compliance — sprinkler systems, fire doors, egress, emergency lighting
Your fitout company should handle permit submissions and compliance documentation. Always confirm this is included in your quote.
4. Engage a Commercial Fitout Specialist
Not all builders are equipped for commercial fitouts. When selecting a fitout company:
- ✅ Confirm they hold a current Victorian Builder's Licence (Domestic Builder Unlimited or Commercial Builder)
- ✅ Review their portfolio — ask to see completed projects similar in scale and type to yours
- ✅ Check references from previous clients
- ✅ Confirm they carry public liability and professional indemnity insurance
- ✅ Clarify their project management process — will you have a dedicated project manager?
- ✅ Understand the quoting process and what's included (design, documentation, construction, project management)
For guidance on choosing the right company, see our post on how to choose a commercial fitout company in Melbourne.
5. Set a Realistic Timeline
A typical commercial fitout timeline in Melbourne looks like this:
| Phase | Duration |
|---|---|
| Briefing and concept design | 1–3 weeks |
| Design development and documentation | 2–4 weeks |
| Landlord and authority approvals | 2–6 weeks |
| Procurement and lead times | 4–8 weeks |
| Construction and installation | 3–10 weeks |
| Defects and handover | 1–2 weeks |
Total: 12–26+ weeks depending on size and complexity.
Allow more time for large projects (1,000+ sqm), heritage buildings, or spaces requiring significant structural works. Cramming a 20-week fitout into 10 weeks is a recipe for cost overruns and quality issues.
6. Plan Your IT and Technology Infrastructure
Technology infrastructure is one of the most frequently underestimated aspects of an office fitout. Plan for:
- ✅ Structured cabling — Cat6 or Cat6A data cabling throughout
- ✅ Server room or comms rack location
- ✅ Wi-Fi access point locations
- ✅ AV and presentation systems — screens, projectors, video conferencing
- ✅ Access control and security systems
- ✅ Phone systems (VoIP or traditional)
- ✅ Future capacity — extra data points and conduit for growth
Engage your IT provider early so their requirements feed into the architectural drawings before construction begins. Retrofitting technology after a fitout is expensive and disruptive.
7. Plan Furniture and Loose Items
Furniture is often treated as an afterthought — but lead times for quality commercial furniture can be 8–16 weeks. Plan early:
- ✅ Workstations, desks, and task chairs
- ✅ Breakout and lounge furniture
- ✅ Boardroom and meeting room furniture
- ✅ Storage and shelving
- ✅ Kitchen and café-style furniture (if applicable)
- ✅ Acoustic panels and soft furnishings
Confirm whether your fitout company coordinates furniture supply or whether you need a separate furniture dealer. Spacez can manage the full project including furniture procurement.
8. Brief Your Staff
Your team will be affected by the fitout — through the construction period and the adjustment to a new space. Plan for:
- ✅ Communication plan: inform staff of the fitout timeline and any disruptions
- ✅ Temporary workspace: if working from the existing space during construction, agree on safe access and working arrangements
- ✅ Change management: if moving to open plan or activity-based working, plan a change management process to bring staff along
- ✅ Move-in day logistics: coordinate with removalists, IT, and the fitout company on handover day
9. Plan Your Budget (and Contingency)
Commercial fitout costs in Melbourne vary significantly by fitout type and level of finish. As a rough guide:
| Fitout Type | Cost per sqm (AUD) |
|---|---|
| Basic office fitout | $800–$1,200 |
| Mid-range office fitout | $1,200–$2,000 |
| High-end office fitout | $2,000–$3,500+ |
| Retail fitout | $1,000–$2,500+ |
| Medical/healthcare fitout | $2,000–$4,500+ |
Always include a contingency of 10–15% above your base budget for unforeseen items — particularly in older Melbourne buildings where hidden services or structural surprises can add cost. For a detailed breakdown, see our office fitout cost guide Melbourne.
10. Confirm Handover Requirements
Before your fitout company mobilises, confirm:
- ✅ Access arrangements — who has keys, what are the building's trading hours?
- ✅ Loading dock booking process
- ✅ Deliveries — how will materials be received and managed on site?
- ✅ Defects process — what is the agreed defects liability period and process?
- ✅ Handover documentation — as-built drawings, warranties, permit certificates
- ✅ Keys, access cards, and security codes on handover
Common Fitout Mistakes (and How to Avoid Them)
Even well-prepared businesses make avoidable mistakes. The most common include:
Starting too late: By the time you need to move, your fitout is half-finished. Engage a fitout company as soon as your lease is signed — ideally 4–6 months before your required move-in date.
Skipping the brief: Vague briefs lead to vague quotes. A well-documented brief enables accurate pricing and reduces variations during construction.
Ignoring the make good: Your exit from the current tenancy may require significant reinstatement works. Budget for make good costs alongside your new fitout costs.
Under-budgeting: A realistic budget — including design, documentation, construction, furniture, IT, and contingency — is essential. Cutting corners on budget invariably means cutting corners on the fitout itself.
Choosing on price alone: The cheapest quote rarely produces the best outcome. Evaluate fitout companies on their project management capability, portfolio quality, and team experience — not just the number at the bottom of the page.
Ready to Start Planning Your Melbourne Office Fitout?
Spacez specialises in office fitouts and commercial fitouts across Melbourne and surrounding suburbs. Our team manages every phase from concept to completion — including design, permits, construction, and furniture coordination.
Contact us today for a free consultation and quote.
Spacez — Melbourne's commercial fitout specialists. On time, on budget, and built to last.