Spacez insight · March 2026 · 13 min read

Strip Out Melbourne: Complete Guide to Commercial Strip Outs

Commercial strip outs in Melbourne from $80-$250/sqm. Expert guide to partial and full strip outs, costs, waste management, and compliance. Free quote from…

Strip Out Melbourne: Complete Guide to Commercial Strip Outs

Key takeaways:

  • Commercial strip out costs in Melbourne range from $80 to $250 per square metre depending on the type and complexity of the strip out
  • A strip out involves removing all or part of a tenancy fitout to return the space to its base building condition or prepare it for a new fitout
  • Strip outs are commonly required for end-of-lease make good obligations, pre-fitout demolition, or building refurbishment
  • All strip out work in Melbourne must comply with WorkSafe Victoria regulations, EPA waste disposal requirements, and may require asbestos assessment
  • Choosing an experienced strip out contractor reduces risk, keeps the project on schedule, and ensures proper waste management

Whether you are vacating a commercial lease, preparing a space for a new fitout, or clearing a tenancy for the next occupant, a strip out is one of the most important — and most misunderstood — stages of any commercial property project. Get it wrong, and you face delays, unexpected costs, compliance issues, and potential disputes with your landlord.

At Spacez, we have been delivering commercial strip outs across Melbourne for over 15 years. We handle everything from small office strip outs to full floor demolitions in high-rise CBD buildings. This guide covers what you need to know to plan, budget, and execute a strip out in Melbourne.

> Need a strip out quote? Request a free consultation or call Dallas on 0447 064 489 to discuss your project.

What is a commercial strip out?

A commercial strip out is the process of removing some or all of the interior elements of a tenancy — including walls, ceilings, flooring, joinery, fixtures, and services — to return the space to a specified condition. That condition is typically either:

  • Base building condition: The state the space was in before any tenant fitout was installed. This usually means exposed concrete floors, bare ceilings with base building services visible, and perimeter walls only
  • Warm shell: A partially finished state that retains some base building finishes such as ceiling grid, basic lighting, and floor coverings
  • Pre-fitout condition: A clean, cleared space ready for a new tenant to begin their fitout works

The required condition depends on your lease terms, the landlord's requirements, or the scope of the upcoming fitout or renovation.

Types of strip outs

Not all strip outs are the same. The type you need depends on why the strip out is being done and how much of the existing fitout needs to be removed.

Full strip out

A full strip out removes everything the tenant has installed, returning the space to its base building condition. This includes:

  • All internal partition walls (plasterboard, glass, timber)
  • Suspended ceiling tiles and grid systems (if tenant-installed)
  • All flooring — carpet, vinyl, tile, timber overlays
  • Kitchen and bathroom joinery, fixtures, and fittings
  • Reception desks, built-in cabinetry, and custom joinery
  • Tenant-installed electrical, data, and communication cabling
  • Supplementary air conditioning units or modifications to the base building HVAC
  • Signage, branding elements, and window treatments

Full strip outs are the most common requirement for end-of-lease make good obligations. Your lease will typically define exactly what needs to be removed and what condition the space must be returned in.

Partial strip out

A partial strip out removes specific elements while retaining others. This is common when:

  • A new tenant wants to keep some of the existing fitout (with landlord agreement)
  • A renovation is planned and only certain zones need to be cleared
  • The lease allows the tenant to leave certain improvements in place
  • Budget constraints require a phased approach

For example, you might strip out all the internal offices and joinery but retain the ceiling grid, lighting, and floor coverings if they are in good condition.

Soft strip out

A soft strip out focuses on non-structural and non-services elements. It typically includes removing furniture, fittings, fixtures, floor coverings, ceiling tiles, and internal partitions — but leaves the mechanical, electrical, and plumbing services in place. This is the quickest and most cost-effective type of strip out.

How much does a strip out cost in Melbourne?

Strip out costs in Melbourne depend on the type of strip out, the size of the space, the complexity of the existing fitout, and any hazardous materials that need to be managed. Here are typical 2026 rates:

Strip out typeCost per sqmTypical scope
Soft strip out$80 – $120Furniture, fittings, floor coverings, ceiling tiles, non-structural partitions
Standard full strip out$120 – $180All tenant improvements including partitions, joinery, flooring, and basic services disconnection
Complex full strip out$180 – $250+Heavy fitout removal, services decommissioning, asbestos abatement, high-rise logistics, after-hours work

For a typical 500 sqm Melbourne office, that translates to:

  • Soft strip out: $40,000 – $60,000
  • Standard full strip out: $60,000 – $90,000
  • Complex full strip out: $90,000 – $125,000+

Factors that affect strip out costs

  • Asbestos: Pre-2000 buildings in Melbourne frequently contain asbestos in ceiling tiles, vinyl flooring, pipe lagging, or fire-rated walls. Asbestos assessment and licensed removal can add $5,000 to $50,000+ depending on the extent
  • Building access: CBD high-rise buildings often have strict loading dock schedules, goods lift booking requirements, and after-hours work mandates that increase logistics costs
  • Services decommissioning: Disconnecting and capping electrical, hydraulic, mechanical, and fire services requires licensed tradespeople and adds to the cost
  • Waste volume: Heavily fitted-out spaces — restaurants, medical centres, retail — generate more waste than standard offices, increasing skip bin and disposal costs
  • Make good standard: If the space must be returned to a specific standard (painted, patched, with operational base building services), the cost increases beyond basic demolition

The strip out process

A well-managed strip out follows a structured process to ensure safety, compliance, and efficiency.

1. Site inspection and scope review

We inspect the site and review the lease make good clause (if applicable) to understand exactly what needs to be removed and what condition the space must be returned to. We photograph and document the existing fitout to create a clear scope of works.

2. Hazardous materials assessment

For any building constructed before 2004, an asbestos assessment is required before demolition work can begin. A licensed assessor inspects the space and provides a report identifying any asbestos-containing materials (ACMs) and recommending a management or removal approach. This is a legal requirement under Victorian occupational health and safety regulations.

3. Services isolation

Before any demolition begins, all tenant services are safely disconnected and isolated. This includes electrical circuits, data and communications cabling, supplementary HVAC, gas (if applicable), and hydraulic services. Licensed electricians, plumbers, and mechanical contractors handle this stage.

4. Demolition and removal

The physical strip out proceeds systematically — typically starting with soft elements (furniture, fittings, ceiling tiles) and progressing to hard elements (partitions, joinery, flooring). Our teams work methodically to minimise dust, noise, and impact on other tenants in the building.

5. Waste management and disposal

All waste is sorted on-site for recycling, reuse, or disposal. We aim to divert at least 80% of strip out waste from landfill through recycling of metals, timber, plasterboard, carpet, and other materials. All waste disposal is documented and compliant with EPA Victoria requirements.

6. Site clean and handover

Once the strip out is complete, the space is thoroughly cleaned and prepared for handover. If the strip out is part of a make good, we may also carry out patching, painting, and services reinstatement to meet the required condition. For details on the full make good process, see our make good requirements guide.

Waste management and sustainability

Commercial strip outs generate significant waste, and responsible waste management is both a legal obligation and an environmental responsibility. Here is how we approach it:

What can be recycled?

  • Metals: Steel studs, aluminium framing, copper cabling, and metal fixtures are all highly recyclable
  • Timber: Solid timber can be repurposed or recycled. Engineered timber products (MDF, particleboard) have more limited recycling options
  • Plasterboard: Clean plasterboard can be recycled through specialist facilities in Melbourne
  • Carpet tiles: Some manufacturers offer take-back programmes, and carpet tiles can be recycled into underlay or other products
  • Glass: Partition glass and window glass can be recycled
  • Concrete and masonry: Crushed and reused as aggregate

What cannot be recycled?

  • Asbestos-containing materials (must be disposed of at licensed facilities)
  • Contaminated materials (paint with lead, treated timber)
  • Mixed waste that has not been separated
  • Some composite materials and laminates

EPA compliance

All waste from commercial strip outs must be transported and disposed of in accordance with EPA Victoria regulations. This includes using licensed waste carriers, disposing of hazardous materials at approved facilities, and maintaining waste tracking documentation. Non-compliance can result in significant fines.

Strip outs and make good obligations

The most common reason for a commercial strip out in Melbourne is to meet end-of-lease make good obligations. Your commercial lease will typically include a make good clause that requires you to return the premises to a specified condition at the end of your lease term.

The strip out is usually the first and largest component of the make good process. Once the fitout has been removed, additional works — such as patching, painting, ceiling replacement, and services reinstatement — bring the space up to the required standard.

For a comprehensive overview of make good obligations, including how to negotiate with your landlord, see our make good requirements guide. For detailed cost information, see our make good costs guide for Melbourne 2026.

Key tips for make good strip outs

  • Review your lease early: Understand your make good obligations at least 6-12 months before your lease expires. The earlier you start planning, the more options you have
  • Get a condition report: Compare the current state of the premises against the original condition report (if one exists) to identify exactly what needs to be done
  • Negotiate before you strip out: In some cases, the incoming tenant or landlord may want to retain parts of your fitout. Negotiating this upfront can save you significant strip out costs
  • Document everything: Photograph the space before, during, and after the strip out to protect yourself against disputes

Compliance requirements for Melbourne strip outs

Commercial strip outs in Melbourne must comply with several regulatory frameworks:

WorkSafe Victoria

All demolition and strip out work must comply with the Occupational Health and Safety Act 2004 and the OHS Regulations 2017. This includes safe work method statements (SWMS), site-specific safety plans, appropriate personal protective equipment (PPE), and qualified personnel for high-risk work.

Asbestos regulations

The Occupational Health and Safety Regulations 2017 require an asbestos assessment before any demolition or refurbishment work on buildings constructed before 2004. Licensed asbestos removalists must carry out any asbestos removal work, and an asbestos clearance certificate is required before the space can be reoccupied.

Building regulations

While strip outs generally do not require a building permit, any work that affects fire safety systems, structural elements, or essential safety measures may trigger permit requirements. A building surveyor can advise on specific requirements for your project.

EPA Victoria

Waste from commercial strip outs must be managed in accordance with the Environment Protection Act 2017. This includes proper waste classification, use of licensed waste transporters, and disposal at approved facilities. Special requirements apply to hazardous waste including asbestos.

Strip outs as part of a new fitout

If you are moving into a space that has an existing fitout, a strip out is often the first stage of your new office fitout project. In these cases, the strip out and fitout are managed as a single project, which offers several advantages:

  • Cost efficiency: A single contractor managing both stages avoids duplication of site establishment, project management, and logistics costs
  • Time savings: The strip out scope can be tailored to the new fitout design — you only remove what needs to change, rather than stripping everything back to base building
  • Design integration: The strip out can preserve elements that work with the new design (existing services routes, structural features, floor coverings in good condition)
  • Single point of accountability: One contractor is responsible for the entire project from demolition through to fitout completion

Why choose Spacez for your Melbourne strip out?

  • 15+ years experience: We have delivered hundreds of commercial strip outs across Melbourne, from small offices to entire building floors
  • Fully licensed and insured: Our team holds all required licences and insurances for commercial demolition and hazardous materials management
  • Integrated service: We can manage your strip out as a standalone project or as part of a larger make good or fitout programme
  • Sustainable practices: We target 80%+ waste diversion from landfill through on-site sorting and partnerships with recycling facilities
  • Fixed-price quoting: We provide detailed, fixed-price quotes so you know exactly what your strip out will cost
  • Minimal disruption: We work within building management requirements and coordinate after-hours work where needed to minimise impact on other tenants

Frequently asked questions

How long does a commercial strip out take?

A standard office strip out of 300-500 sqm typically takes one to two weeks. Larger spaces, complex fitouts, or projects requiring asbestos removal may take three to four weeks. After-hours-only schedules extend the timeline.

Do I need a permit for a strip out?

Most internal strip outs do not require a building permit. However, if the work affects fire safety systems, structural elements, or essential safety measures, a permit may be required. An asbestos assessment is legally required for pre-2004 buildings.

Who is responsible for the strip out at end of lease?

The tenant is typically responsible for all make good works, including the strip out, unless the lease states otherwise. Some landlords agree to accept a cash settlement in lieu of physical works, but this must be negotiated.

Can I do a strip out myself?

While you can remove some soft elements (furniture, fittings), the demolition and services disconnection components should be carried out by licensed professionals. This ensures compliance with WorkSafe regulations, proper waste disposal, and protection against liability.

What happens to the waste from a strip out?

All waste is sorted on-site and sent to appropriate recycling or disposal facilities. Metals, timber, plasterboard, glass, and carpet are separated for recycling. Hazardous materials are disposed of at licensed facilities. We provide waste documentation on request.

Get a strip out quote

If you need a commercial strip out in Melbourne — whether for make good, pre-fitout demolition, or building refurbishment — we can help. Request a free consultation or call Dallas on 0447 064 489 to discuss your project. We provide obligation-free site inspections and detailed fixed-price quotes.