Spacez insight · March 2026 · 7 min read
Tenant Fitout Melbourne | Commercial Lease Fitout Guide
Complete guide to tenant fitouts in Melbourne commercial leases. Understand landlord approvals, TIA, make good obligations, and how to manage your fitout from…
Tenant Fitout Melbourne: Your Rights, Obligations, and How to Get It Right
Taking on a new commercial lease in Melbourne is exciting — but between signing the lease and opening your doors, most tenants face a fitout that costs hundreds of thousands of dollars and takes weeks to months to complete. Get it wrong and you'll be over budget, behind schedule, or in breach of your lease. Get it right and your new space will serve your business for the life of the tenancy.
This guide explains everything Melbourne commercial tenants need to know about the fitout process: your rights, your obligations, landlord approvals, tenant improvement allowances, make good requirements, and how to manage the whole process.
What Is a Tenant Fitout?
A tenant fitout is the construction work you carry out on a commercial premises to make it suitable for your specific use. It includes everything from partition walls and flooring to joinery, electrical, data cabling, HVAC modifications, and signage.
Most commercial premises in Melbourne are leased in one of three conditions:
| Condition | What's Included | What You Need to Add |
|---|---|---|
| Cold shell | Concrete slab, structural walls, base building services stub-out | Everything — full fitout from scratch |
| Warm shell | HVAC rough-in, electrical distribution board, bathrooms | Internal walls, ceilings, joinery, flooring, lighting |
| Cat A / Fitted | Base building finish — carpet, suspended ceiling, recessed lighting | Personalisation, meeting rooms, kitchen, joinery |
Understanding which condition your premises is in determines the scope and cost of your fitout. Ask your leasing agent to confirm this before you sign.
Your Lease and the Fitout Clause
Before you start any fitout planning, read your lease carefully. Commercial leases in Victoria typically include:
Landlord consent clause
Almost all commercial leases require the landlord's written consent before you carry out any fitout work. This typically means submitting:
- Architectural drawings (floor plan, elevations)
- Mechanical and electrical drawings
- Builder details and insurance certificates
- Building permit details (once obtained)
The landlord review process typically takes 3–6 weeks. Some institutional landlords have design review panels that meet monthly — factor this into your programme.
Permitted use
Your lease specifies the permitted use of the premises. Your fitout must be consistent with this use. If you are converting a previously unfitted space for a new use (e.g. converting office space to a medical clinic), you may need the landlord's consent for a change of use as well.
Approved materials and finishes
Some leases — particularly in premium office buildings and shopping centres — specify approved materials, finishes, or base building standards. Read these requirements before making any design decisions.
Make good obligations
The most important lease clause to understand before you start your fitout is the make good clause. This specifies what you must do at the end of the lease: do you restore the space to its original condition (strip out your fitout), or do you leave it as fitted?
Understanding make good obligations before you commit to your fitout design can save significant money. If you're required to strip out everything at lease end, fitting out with high-specification joinery may not be the best investment. See our end of lease make good Melbourne guide for full detail.
Tenant Improvement Allowance (TIA) — Getting Your Landlord Contribution
A tenant improvement allowance (TIA) is a cash contribution from the landlord to help fund your fitout. TIAs are most commonly offered in:
- CBD and fringe office buildings during lease negotiation
- Shopping centre retail leases
- Medical and healthcare buildings
Typical TIA ranges in Melbourne (2026)
| Building Type | TIA Range |
|---|---|
| Premium CBD office | $800–$1,500/sqm |
| A-grade CBD/fringe office | $500–$900/sqm |
| B-grade suburban office | $200–$500/sqm |
| Shopping centre retail | $300–$800/sqm |
| Medical building tenancy | $200–$600/sqm |
How to negotiate a TIA
TIAs are negotiable. The best time to negotiate is before you sign the lease — once you sign, your leverage largely disappears. Tips:
- Get multiple leasing options. Competing landlords gives you leverage.
- Ask for cash, not landlord-managed works. A cash TIA lets you manage your own fitout to your specification. Landlord-managed works (where the landlord does the fitout) are often lower quality and harder to control.
- Be specific about your fitout cost. Landlords are more likely to offer a higher TIA when you can demonstrate a credible fitout budget.
- Negotiate incentive packages. TIA is one component of a lease incentive — rental abatement, free rent periods, and TIA can all be traded off against each other.
TIA conditions
Most TIAs come with conditions:
- Works must be completed within a specified period (often 6–12 months of lease commencement)
- You may need to provide invoices/evidence of expenditure before receiving payment
- Some TIAs are structured as rent abatement rather than cash
- The TIA may be clawed back if you break the lease early
The Tenant Fitout Approval Process
Step 1: Engage your fitout company early
Engage a commercial fitout company — like Spacez — as early as possible, ideally before you sign the lease. We can:
- Review the lease and advise on fitout implications
- Inspect the premises and give you an indicative cost range
- Help you negotiate your TIA based on a realistic fitout budget
- Advise on the feasibility of your intended use in the space
Step 2: Develop design documentation
Once you've signed the lease, we develop your fitout design to landlord approval standard:
- Floor plan and reflected ceiling plan
- Elevations and joinery drawings
- Services drawings (mechanical, electrical, hydraulic)
- Materials and finishes schedule
Step 3: Submit for landlord approval
We submit your design documentation to the landlord for review. Depending on the building and landlord, this takes 2–6 weeks. We manage the response and any requested changes.
Step 4: Obtain building permit
Commercial fitout works in Victoria require a building permit. We engage a registered private building surveyor, prepare the permit application, and manage the process. Building permits typically take 2–4 weeks.
Step 5: Construction
Once landlord approval and building permit are in hand, construction commences. A typical Melbourne office tenant fitout (200–400 sqm) takes 6–10 weeks. Retail fitouts in shopping centres often have additional requirements around after-hours access and centre-specific protocols.
Step 6: Handover and occupation
We provide an occupation certificate (or equivalent), as-built drawings, and warranties. You can now open your doors.
Common Mistakes Tenants Make
Signing the lease before getting a fitout cost estimate
The cost of your fitout can be equal to or exceed your first year's rent. Getting an indicative fitout cost before you sign the lease — while you still have negotiating power for TIA — is essential.
Underestimating the TIA negotiation
Many tenants accept the first TIA offer. The initial offer is rarely the best offer. A fitout company that can provide a credible cost estimate gives you the evidence to negotiate a higher TIA.
Not reading the make good clause
Make good costs at end of lease can be $50,000–$200,000+. Understanding this upfront affects your fitout investment decisions — particularly whether premium joinery and bespoke elements are worth the cost if they must be removed at lease end.
Starting fitout before landlord approval
Carrying out fitout works without landlord consent is a breach of your lease. The landlord can require you to undo all works at your cost. Always get written consent before construction starts.
Using a residential builder
Commercial fitouts in Victoria require a commercial builder's licence (Victorian Building Authority). Using a residential builder for a commercial fitout creates compliance, insurance, and quality risks.
Tenant Fitout Checklist: Melbourne
Before you sign your lease:
- [ ] Get an indicative fitout cost from a commercial fitout company
- [ ] Understand the existing condition of the premises (cold shell, warm shell, Cat A)
- [ ] Read and understand the make good clause
- [ ] Negotiate your TIA as part of the lease incentive package
During lease negotiation:
- [ ] Confirm landlord approval requirements for fitout
- [ ] Understand the permitted use and any constraints on your fitout
- [ ] Check for approved finishes or base building standards
During fitout:
- [ ] Obtain written landlord approval before starting any works
- [ ] Ensure your builder holds a current commercial builder's licence (VBA)
- [ ] Ensure building permit is in place before construction commences
- [ ] Keep records of all TIA-qualifying expenditure
At handover:
- [ ] Receive as-built drawings and commissioning certificates from your fitout company
- [ ] Confirm occupation certificate (or equivalent) has been issued
- [ ] File all documentation — you'll need it for make good negotiations at end of lease
For a complete guide to managing your fitout project, see our commercial fitout checklist Melbourne.
How Spacez Helps Melbourne Tenants
Spacez works with commercial tenants throughout Melbourne — from the moment you're shortlisting properties through to handover and beyond. We understand commercial leases, landlord approval requirements, building permits, and the construction process. We manage the whole thing so you can focus on running your business.
Request a consultation — we'll review your lease, inspect the space, and give you an honest assessment of your fitout options and costs. We work with tenants across Melbourne CBD, inner suburbs, and greater Melbourne.
Also see: commercial fitout cost Melbourne | make good Melbourne | commercial fitout checklist Melbourne