How to Read a Commercial Fitout Quote Melbourne
A well-structured fitout quote is more than a single lump sum. It should break your project into clear scopes of work, with individual line items or trade…
What a Fitout Quote Should Include
A well-structured fitout quote is more than a single lump sum. It should break your project into clear scopes of work, with individual line items or trade packages you can evaluate and compare.
Here's what a comprehensive quote typically covers:
1. Demolition and Strip-Out
Before building anything new, the existing fitout often needs to come out. This includes:
- Removal of existing partitions, ceilings, and flooring
- Disconnection and removal of outdated electrical or mechanical systems
- Disposal of materials (skip bins, recycling fees)
If demolition isn't listed — or is bundled into a vague "preparation" line — ask your builder to separate it. Demolition costs in Melbourne CBD can range from $10–$30 per square metre depending on the complexity.
2. Structural and Building Works
This covers any changes to the physical structure of the tenancy, including:
- New partition walls (typically glass or plasterboard)
- Ceilings — either suspended acoustic tiles or plasterboard
- Flooring — substrate prep, screed levelling, installation
- Joinery — reception desks, kitchenettes, storage units, feature walls
Each of these should be itemised. A quote that groups all building works into one line is not giving you visibility.
3. Mechanical, Electrical, and Plumbing (MEP)
This is often the most significant cost category, and the most likely to blow out if not properly scoped. Look for:
Mechanical (HVAC):
- Is the existing air conditioning adequate for the new layout?
- Are new grilles, VAV boxes, or ductwork required?
- Has the builder coordinated with the building owner about existing plant capacity?
Electrical:
- Power outlets, data cabling, switchboard upgrades
- Lighting — specification type (LED downlights, pendant fittings, strips)
- Emergency and exit lighting compliance
Plumbing:
- New amenities, kitchenette connections, floor waste installation
If a quote lists "electrical allowance: $15,000" as a single line with no further breakdown, ask for a detailed scope. Allowances are estimates — if actual costs exceed them, the variation comes back to you.
4. Hydraulics and Compliance
Includes:
- Fire services — sprinkler adjustments, new detectors, hydrant relocation
- Building permits and council approvals
- Accessibility compliance (DDA/BCA requirements)
These are non-negotiable compliance items. A quote that omits fire services or permit costs is missing a meaningful expense.
5. Finishes and Specifications
This is where quotes diverge most significantly. Look carefully at:
- Flooring: What product? What brand? What grade of carpet tile or LVT?
- Partitioning: Glazed or solid? What acoustic rating?
- Paint: How many coats? Which colour palette?
- Joinery: What substrate and finish — melamine, laminate, veneer?
A quote built around "PC items" (prime cost items — a budget allocation for a product not yet selected) means you're likely to exceed the allowance when you actually specify. Push for named products and brands wherever possible.
The Difference Between Fixed Price and Estimate
This distinction matters enormously.
Fixed price (lump sum): The builder takes the risk. As long as the scope doesn't change, you pay what's quoted. Variations only arise from client-requested changes or unforeseen site conditions.
Estimate or indicative price: The builder is signalling they don't have full visibility of the scope. Expect the final price to be higher. This is common in early-stage quoting, but you should push for a fixed price before signing.
Always ask: "Is this a fixed price contract or an estimate?"
Understanding Exclusions
Every quote has an exclusions list — items that are not included in the price. These are often where projects blow out. Common exclusions to watch for include:
- Building owner approval or consent fees
- Asbestos or hazardous material removal
- IT and AV fitout (structured cabling, audio-visual equipment)
- Furniture and loose furnishings
- Signage
- Security systems and access control
- Window treatments (blinds, film)
- Wet area waterproofing beyond standard scope
If any of these items are relevant to your project, they need to be in someone's scope. Either add them to the builder's scope, or budget for them separately with a specialist subcontractor.
Variations: The Real Cost Driver
Variations are changes to the agreed scope that result in additional charges. They are legitimate — sometimes unavoidable — but they are also the biggest source of budget overruns.
Ask your builder:
- What variation process do you use?
- Will I receive a written variation before you proceed?
- What is your standard margin on variations?
A reputable builder will have a clear variation protocol. Be wary of builders who are vague about this or who suggest verbal approvals are sufficient.
How to Compare Multiple Quotes Effectively
If you're comparing quotes from multiple builders, don't compare the bottom-line number alone. Compare:
- What's included: Is the scope the same? Are PC items and allowances at comparable levels?
- What's excluded: One quote may be cheaper because it excludes fire services or doesn't include permits.
- Specification level: Are both quotes based on the same finishes and products?
- Programme: When will the project be complete? A longer build may affect your lease start date and rent obligations.
- References and track record: Can they demonstrate similar projects in Melbourne?
A lower quote that requires $40,000 in variations and finishes two months late is not a better deal than a higher quote that delivers on time with no surprises.
Red Flags in a Fitout Quote
Watch for these warning signs:
- Large PC items and allowances with no product specifications
- No exclusions list — everything should have some exclusions; if there are none, ask what's been missed
- No programme or timeline — a professional builder will include a construction schedule
- Vague descriptions: "Building works — $85,000" tells you nothing
- No payment schedule: You should see milestone-based payments, not arbitrary draws
- No mention of contract terms: All fitout projects should be documented under a proper building contract (typically HIA or MBA)
Provisional Sums vs Prime Cost Items
Two terms that often catch clients off guard:
Provisional Sum (PS): An estimated cost for work that can't be fully specified yet (e.g., "unknown site conditions"). The final amount varies based on actual cost. Unlike a PC item, the builder does the work — you just don't know the price yet.
Prime Cost (PC) Item: A budget allocation for a product supplied by the client or a specialist (e.g., "PC $3,500 for kitchen appliances"). If the client spends more, they pay the difference. If less, they receive a credit.
If your quote has multiple PS and PC items, the "fixed price" is less fixed than it appears. Ask for these to be firmed up before signing.
Why Spacez Quotes Differently
At Spacez, our quotes are fully detailed lump-sum proposals. We specify products, list exclusions clearly, and present a construction programme with each proposal.
We do this because we believe informed clients make better project partners. When you understand what you're paying for, the project runs more smoothly — fewer surprises, fewer disputes, better outcomes.
Our quotes typically include:
- Line-by-line scope breakdown by trade
- Specification schedules for flooring, partitioning, joinery, and finishes
- Clear exclusions list
- A fixed price (not an estimate) where scope is fully defined
- A milestone-based payment schedule
- A draft programme showing key dates
If you've received a quote elsewhere and want a second opinion — or just want to understand what you're looking at — call us on 0447 064 489 or visit spacez.com.au.
Getting Your Fitout Quote Right From the Start
The best time to get clarity on your fitout budget is before you sign a lease. Many Melbourne tenants underestimate fitout costs and find themselves locked into a space they can't afford to fit out properly.
We offer obligation-free pre-lease fitout cost assessments. Bring us the lease plans and your brief, and we'll give you a realistic cost range before you commit.
Related reading:
- Commercial Fitout Cost Guide — What to Expect in Melbourne
- How to Brief a Fitout Builder
- Commercial Fitout Process Step by Step